1. Hump support has good rigidity, allows for large loads, and can reliably withstand various pressures applied to it.
2. Hump support has excellent fluid dynamics performance.
3. Hump support filling particles or fragments are not easy to block the hole opening. For filling smaller than DN25, a layer of 300mm high large filling can be first laid on the support plate, and then small filling can be stacked.
4. Hump support is lightweight and saves materials. It can be made of materials such as metal, plastic, ceramic, graphite, etc.
5. Hump support unit combination structure, easy to install from manhole.
6. The camel hump supports the three-dimensional structure of the support plate, which is conducive to increasing the opening area and making the opening area around 100%. The principle of opening area is that the opening rate must be greater than the porosity of the packing layer, otherwise the support plate forms a "bottleneck" zone, reducing the tower load. The opening area is related to the structure, material, and tower diameter, generally accounting for 70% -100% of the tower section. For metal support plates, it should be around 100%.